↓ Skip to main content
Altmetric Badge

Mentioned by

twitter
1 X user

Readers on

mendeley
207 Mendeley
You are seeing a free-to-access but limited selection of the activity Altmetric has collected about this research output. Click here to find out more.
Article details
Title
Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives
Published in
Production Planning & Control, February 2020
DOI 10.1080/09537287.2020.1725170
Authors

Login to access the Attention Digest and the Sentiment Analysis related to this output.

Timeline Attention over time Attention Score history
Login to access the full charts related to this output.
Activity
Login to access the full charts related to this output.
X Demographics

X Demographics

The data shown below were collected from the profile of 1 X user who shared this research output. Click here to find out more about how the information was compiled.
Mendeley demographics

Mendeley demographics

The data shown below were compiled from readership statistics for 207 Mendeley readers of this research output. Click here to see the associated Mendeley record.
Login to view Mendeley reader trends over time.

Geographical breakdown

Geographical breakdown
Country Count As %
Unknown 207 100%

Demographic breakdown

Readers by professional status
Readers by professional status Count As %
Unspecified 41 20%
Student > Master 22 11%
Student > Ph. D. Student 13 6%
Student > Bachelor 9 4%
Student > Doctoral Student 6 3%
Other 21 10%
Unknown 95 46%
Readers by discipline
Readers by discipline Count As %
Engineering 50 24%
Unspecified 41 20%
Business, Management and Accounting 12 6%
Economics, Econometrics and Finance 3 1%
Computer Science 1 <1%
Other 3 1%
Unknown 97 47%
Attention Score in Context

Attention Score in Context

This research output has an Altmetric Attention Score of 1. This is our high-level measure of the quality and quantity of online attention that it has received. This Attention Score, as well as the ranking and number of research outputs shown below, was calculated when the research output was last mentioned on 21 July 2020.
All research outputs
#28,765,547
of 34,539,236 outputs
Outputs from Production Planning &amp; Control
#321
of 495 outputs
Outputs of similar age
#407,038
of 515,409 outputs
Outputs of similar age from Production Planning &amp; Control
#8
of 11 outputs
Altmetric has tracked 34,539,236 research outputs across all sources so far. This one is in the 9th percentile – i.e., 9% of other outputs scored the same or lower than it.
So far Altmetric has tracked 495 research outputs from this source. They receive a mean Attention Score of 2.7. This one is in the 29th percentile – i.e., 29% of its peers scored the same or lower than it.
Older research outputs will score higher simply because they've had more time to accumulate mentions. To account for age we can compare this Altmetric Attention Score to the 515,409 tracked outputs that were published within six weeks on either side of this one in any source. This one is in the 12th percentile – i.e., 12% of its contemporaries scored the same or lower than it.
We're also able to compare this research output to 11 others from the same source and published within six weeks on either side of this one. This one is in the 9th percentile – i.e., 9% of its contemporaries scored the same or lower than it.